West Yorkshire Police
Fully glazed reception areas often experience heat and light gain which make the working environment uncomfortable. This police scientific support unit was no exception and almost a year after Dearnleys had installed Astralux system 3000 roller blinds to all the office and laboratory windows they were set the challenge of shading the full height reception glazing.
The ideal solution would have been electrically operated Astralux system 3000 roller blinds but with the building complete and no local power feeds manually operated Astralux roller blinds were specified. The flame retardant screen material matched the other blinds in the building and significantly reduced glare and heat gain whilst still preserving an external view.
Astralux 3000 roller blind system is available with the following control options; electric, side chain, gearbox with permanently attached or removable handle and spring operation.
As this was a completed building access to safely install the blinds was made using a scissor lift with an extendable platform.
Download full details of this project (PDF)
« All Projects
For more information please call:
01924 371 791
The barrel vaulted ceilings of this popular shopping centre were refurbished…
» More Info
This headquarters building was originally built around a courtyard but with…
» More Info
Peterborough Arena is a leading exhibition and events space located at the East…
» More Info
The Word in South Shields is a state-of-the art cultural venue. It is the national…
» More Info
The Project included a new, state of the art two storey Office building / control…
» More Info
The client took the top two floors of this new building in Leeds and it was…
» More Info
The addition of a summer house to a penthouse suite afforded commanding views…
» More Info
The Leadenhall Building, affectionately known as the Cheesegrater, has the main…
» More Info
This new build office incorporated a circular entrance with glazed rooflight…
» More Info
This new build conservatory suffered heat gain and excessive glare in summer…
» More Info
Dearnleys, one of the UK’s leading designers, manufacturers and installers…
» More Info
This hall was built for the Wakefield Industrial Co-operative Society and has…
» More Info
Siemens is a leading global engineering and technology services provider with…
» More Info
St Paul’s Place enjoys a spectacular views over the renowned Peace Gardens…
» More Info
Built in 1878 St Paul’s House is a Grade II listed former clothing warehouse.…
» More Info
This glazed rooflight provided natural light to a bank of check-in desks below…
» More Info
Bowcliffe Hall is an events and meeting venue near Wetherby and has recently…
» More Info
This £21m development creating world class media and players' facilities…
» More Info
Automated blinds for glare and heat control manufactured and fitted…
» More Info
This project involved shading of windows and a large atria space for the Council…
» More Info
This Grade 2 listed art gallery needed blinds to existing rooflight glazing…
» More Info
This 4 star, 170 bedroom hotel was created from an unprepossessing derelict…
» More Info
The floor to ceiling glazing in this supermarket caused excessive glare for…
» More Info
Victoria Gate Casino in Leeds is the third largest casino in the UK. Opened…
» More Info
Dating back to 1733 Nostell Priory is now run by the National Trust. Refurbishment…
» More Info